Why are nuclear power construction costs so high?
Nuclear power currently makes up slightly less than 20% of the total electricity produced in the US, largely from plants built in the 70s and 80s.
Essays about buildings, infrastructure, and industrial technology. Click to read Construction Physics, by Brian Potter, a Substack publication with tens of thousands of subscribers.
Visit constructionphysics.substack.com → RSS feedOn Hacker News Jun 2021 – Apr 2023
Tech Industry & Business 8Society, Policy & Culture 7History & Retro Computing 5Infrastructure & DevOps 3Science & Space 1Hardware & Electronics 1
Nuclear power currently makes up slightly less than 20% of the total electricity produced in the US, largely from plants built in the 70s and 80s.
It’s become fairly common knowledge that Yellowstone National Park, in addition to being incredibly beautiful, is sitting on top of an enormous supervolcano that catastrophically erupts every few hundred thousand years.
This week we conclude our look at nuclear power construction costs. So far we’ve looked solely at conventional nuclear power stations that supply electricity to the grid for residential and commercial use. But civilian power stations aren’t the only sort of nuclear reactor that the US builds. The US Navy has been…